Activate Studios — Internal Status Board

EKKA · the state of play

Internal — CJ · Ty · Dom
As of Thursday 12 June 2026
Show: 8–16 Aug · Bump-in: 1–7 Aug
Prepared by Dom for the Ty catch-up
T−57days to gates open
Today12 Jun
Quote briefs outJune
Fabricationthru July
Bump-in1–7 Aug · T−50
Gates openSat 8 Aug 9am
Strike16–18 Aug

The last three weeks 22 May → today — what the time went into

Week of 22 May

The brain + concierge went live. All EKKA ground truth reconciled to the client portal; ekka-brain concierge deployed for CJ. Phone build approach costed honestly (parts cheap, labour real). Retainer review delivered.

Week of 2 Jun

CJ drove Legends Wall content. Archive dig → V1 → people-first V2 mockup on Vercel. Floor-plan handover doc for Scotty produced. Phone spec evolved in chat: 4 numbers, secret number, frame lights.

This week

Legends Wall went mathematical. Layout solver reads CJ's drawings to scale → exact cut sheet; 4m wall solved, every gap 25.0cm. Phone spec V2 + CJ's two production agents built; one phone confirmed. Framework Desktop plan written.

The tracks five running in parallel

EKKA 150 — the build sign-offs pending

Where it stands
Concept locked to the four moments: Prologue · Morph Wall · Hall of Living Legends · Dodgem. $45K ex GST, billed $11,250 × May–Aug. Schedule holds: quote briefs → July fabrication → bump-in 1 Aug.
Next
Quote briefs out → fabrication runway through July.
Blocked on
Cat: app-vs-phone + two additions (due end May — now 2 wks overdue).

Hall of Living Legends moving fast

Where it stands
Content V2 live (people-first). 4m wall layout SOLVED — exact 25cm gaps, cut sheet ready for Scotty. CJ's colour code cracked as the size key; both walls extracted programmatically from his drawings.
Next
CJ picks the 5m wall treatment (4 options sent, renders attached) → 5m cut sheet same day → fabrication can move.
Blocked on
CJ: colour-key confirm + 5m option. The 150 Space.blend file would anchor everything 1:1.

"Call the Past" phone spec'd, ready

Where it stands
One phone confirmed. 4 numbers (3 in the teladex + 1 secret = Vic Summers). Frame lights wired off the same Pi. Transcripts + telecoil for accessibility. CJ's two content agents built — scripts + ElevenLabs voice-aging pipeline ready to run.
Next
Content production can start now (team voices, aged). Hardware build after Cat's sign-off. Light cabling must hit Scotty's plan before the baffle is clad.
Blocked on
Cat: "the app, or the phone?" sign-off. Ty: comfort with in-house build vs your specialist (≈ cost-neutral at one unit; bespoke lights tip it in-house).

AI rails & infrastructure building

Where it stands
ekka-brain concierge live for CJ at assured.subfrac.cloud. Framework Desktop plan written — Ty's box, Arch installed, 128GB unified memory confirmed: Gemma 3 27B-class local models run comfortably with headroom for image generation alongside.
Next
Stage 0 setup on the box (Ollama, Docker, Tailscale) → local concierge parity → HuggingFace asset-gen capability map for Morph Wall / Legends production.
Blocked on
Nothing — Stage 0 can start now.

"Call the Past" — at a glance the 60-second version

The momentPeriod handset in the Hall of Living Legends — pick up, dial, hear a champion tell their story
Numbers4 per phone: 3 listed in the teladex + 1 secret to find
The line-upCrotty · Richards · Haag · secret = Vic Summers
Clips~40s each, team voices aged via ElevenLabs — no actors
The magicThe champion's frame on the wall lights up while they speak
AccessibilityLarge-print transcripts in the teladex + telecoil in the handset
Cost (one unit, loaded)~$1.4–3.8K est. — ≈ the $3,070 line already carried
StatusStaged until Cat signs "the app, or the phone?"

Risk register

Cat's sign-offs 2 weeks overdue. Phone, light show, ticket booth all staged until she signs. Chase this week.

5m Legends wall needs CJ's call. Real frame sizes vs drawn spread can't both hold — 4 options with him now. Cut sheet same-day once picked.

Phone & wall builds are coupled. Frame-light cabling must be routed before the Legends baffle is clad — sequencing lives in Scotty's plan.

Morph Wall tech undecided (projection vs period TVs) — gated on the Microhire intro. The print layer holds either way.

Staying visible Ty's "how do I see this without asking" — three layers

1 · This board

Regenerated from the EKKA brain whenever status moves — ask Dom for the latest, or it can be auto-published to a private URL. One page, five tracks, the decision queue.

2 · Ask the concierge

The ekka-brain concierge holds all of this live. CJ already uses it daily. You have a loginassured.subfrac.cloud, credentials with Dom. Ask it anything: budget state, what's blocked, who owns what.

3 · The brain itself

Ground truth lives in ten files at ekka150-context/ — status, budget, concept, sourcing, app build. The client portal stays the client-facing canon; the brain reconciles to it.